0 bricks
Base estimate (wall + mortar)
0 bricks
Including 5% wastage
This brick calculator guide helps builders, architects, and homeowners easily estimate the total number of bricks required for constructing a wall or building structure.
Instead of manually applying complex formulas, this calculator gives quick results saving time and avoiding costly miscalculations.
Whether you are planning a renovation or a complete project, correct estimation ensures smooth execution and budget management.
A brick calculator is a tool used to estimate how many bricks are required for building a wall, room, or entire home structure.
It considers brick size, mortar thickness, wall area, and destruction losses to give you the closest real-world brick count.
It supports single and double walls depending on construction needs.
Accurate brick estimation prevents materials shortage that can cause delays in construction.
It also avoids purchasing extra bricks that increase your project cost unnecessarily.
You get proper budgeting and labor planning for efficient building phases.
The formula determines total number of bricks based on area covered by each brick including mortar thickness.
Then it divides wall area by area covered by one brick unit.
The result is scaled if double wall thickness is selected.
Wall Size: 10 ft × 10 ft, Brick: 19 cm × 9 cm, Mortar: 1 cm
Convert feet to meters → find wall area → apply formula → we get around 550 bricks.
Wall Size: 12 ft × 9 ft, 5% wastage included
Calculation returns a total around 480 bricks including wastage.
Double wall, wall area = 100 sq ft
Estimated number of bricks roughly doubles compared to single wall.
Small feature wall with minimal wastage wall estimation
Cost calculated by multiplying number of bricks by $ price per brick.
Large boundary wall using customized brick sizes
This helps construction planning and prevents material waste.
Wall Area = Wall Length × Wall Height
Brick Coverage Area = (Brick Length + Mortar) × (Brick Height + Mortar)
Total Bricks = Wall Area ÷ Brick Coverage Area
Brick Count for Standard Sizes (Single Wall)
| Wall Area | Indian Bricks | US Bricks | UK Bricks | Mortar | Wastage | Total |
|---|---|---|---|---|---|---|
| 10 sq ft | 55 | 58 | 52 | 1 cm | 5% | 58 |
| 20 sq ft | 110 | 116 | 104 | 1 cm | 5% | 122 |
| 30 sq ft | 165 | 174 | 156 | 1 cm | 5% | 173 |
| 40 sq ft | 220 | 232 | 208 | 1 cm | 5% | 242 |
| 50 sq ft | 275 | 290 | 260 | 1 cm | 5% | 304 |
| 60 sq ft | 330 | 348 | 312 | 1 cm | 5% | 360 |
| 70 sq ft | 385 | 406 | 364 | 1 cm | 5% | 428 |
This table helps estimate bricks at a glance without deep calculations.
| Wall Type | Brick Needed | Cost ($) | Height | Length | Mortar | Wastage |
|---|---|---|---|---|---|---|
| Single | 550 | 275 | 10 ft | 10 ft | 1 cm | 5% |
| Double | 1100 | 550 | 10 ft | 10 ft | 1 cm | 5% |
| Single | 450 | 225 | 9 ft | 12 ft | 1 cm | 5% |
| Double | 900 | 450 | 9 ft | 12 ft | 1 cm | 5% |
| Single | 300 | 150 | 8 ft | 8 ft | 1 cm | 5% |
| Double | 600 | 300 | 8 ft | 8 ft | 1 cm | 5% |
| Single | 800 | 400 | 15 ft | 10 ft | 1 cm | 5% |
Below is a quick reference cost comparison between different regions.
| Region | Brick Price ($) | 1000 Bricks Cost ($) | Mortar | Size | Shipping | Total ($) |
|---|---|---|---|---|---|---|
| USA | 0.50 | 500 | 1 cm | Standard | 50 | 550 |
| India | 0.10 | 100 | 1 cm | Standard | 20 | 120 |
| UK | 0.45 | 450 | 1 cm | Standard | 45 | 495 |
| Australia | 0.55 | 550 | 1 cm | Standard | 60 | 610 |
| Canada | 0.40 | 400 | 1 cm | Standard | 50 | 450 |
| UAE | 0.35 | 350 | 1 cm | Standard | 40 | 390 |
| Europe | 0.60 | 600 | 1 cm | Standard | 70 | 670 |
This calculator does not automatically subtract area of doors and windows unless entered manually.
It does not consider decorative bricks or curved walls where brick count varies.
Real-world cost may change due to transport, taxes and market availability.
You now understand brick estimation factors, pricing influence and how various parameters affect overall quantity.
Use this guide whenever you plan to calculate materials for wall construction.
Better planning leads to better execution and a successful project completion.